News

Two records were broken by the Keshen 41 well in the Tarim Oilfield.

15

2026-05

Two records were broken by the Keshen 41 well in the Tarim Oilfield.

On May 11, it was learned from the Tarim Oilfield that the Keshen 41 well was officially put into production, with 300,000 cubic meters of natural gas produced…

Jilin Oilfield fills the gap in profile control technology for high-temperature water flooding reservoirs.

08

2026-05

Jilin Oilfield fills the gap in profile control technology for high-temperature water flooding reservoirs.

​On May 5th, it was learned from Jilin Oilfield that the high-temperature resistant and high-strength water-absorbing swelling particle plugging agent develop…

The service industry of Huabei Oilfield is actively integrating into the global energy industry chain.

24

2026-04

The service industry of Huabei Oilfield is actively integrating into the global energy industry chain.

On April 20th, 72 sets of camp houses, the first batch of products exported by Huabei Oilfield to Turkey, were successfully delivered by sea.