CN / EN

  • Home

  • About us

    About us

    Development history

    Corporate culture

    Global layout

    Social responsibility

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video

  • Workshop

    Production workshop

    Quality reality

  • Honor

    Qualification

    Enterprise Honor

  • Download

  • Application

  • News

  • Contact us

CNPC Logging completed the bridge shooting construction of the Group's first CBM electric drive fracturing platform

Release time:2024-04-19 11:28:06 Clicks:


At 3 am on April 1, the last section of Jishen 5-8 Ping 02 well tool string out of the wellhead, marking that the logging C3291 operation team of CPC successfully completed the first round of bridge shooting of 3 horizontal Wells of the Group's first CBM electric drive fracturing platform after 19 days. The success rate and the emission rate of the wheel are **.
Jishen 5-8 platform uses one set of electric drive fracturing equipment to replace two sets of 3000 traditional fracturing units, reducing a series of complex mechanical structures, lower maintenance costs, easier maintenance, compared with traditional wood drive fracturing reduces noise pollution, saves energy consumption, improves construction efficiency and has stronger stability.
Engineers and technicians checked and tested the preparation of site visualization, equipment and facilities, engineering software, personnel documents and qualification evaluation against the specific requirements of the "first well project". During the operation, technicians optimized the application of new automatic and semi-automatic operating systems such as remote control of wellhead insertion and extraction and remote grease injection system, and combined with the selection of 89 single-joint module guns with the inner diameter of 114.3 mm casing to ensure safe operation under continuous construction, creating the fastest single-section construction record in the region.


Previous:CNPC logging accurate detection supports the construction of "super green charging treasure"
Next:The first "scenic Firewood storage" microgrid in the second oil production plant of Changqing Oilfield was put into operation
Back to list

Take a look

  • Since the beginning of the year, Daqing Drillin…
  • ​On March 23, it was learned from Jinxi Petroc…
  • On March 24th, at the construction sites of the…
  • ​Lanzhou Petrochemical Company has successfull…
  • On March 5th, at the site of Well Wawa 38-39-K0…
  • ​Just after the Spring Festival, good news cam…
  • On January 21st, the Wunan 3-2-13X well of the …
  • As of December 3rd, Daqing Oilfield, the worlds…
  • On November 28th, it was learned that the Daan …

Product recommendation

Three piece forged steel trunnion ball valve

Three piece forged steel trunnion bal…

Cast steel ball valve

Cast steel ball valve

Stainless steel ball valve

Stainless steel ball valve

Top entry eccentric semi ball valve

Top entry eccentric semi ball valve

Side Mounted Eccentric Semi Ball Valve

Side Mounted Eccentric Semi Ball Valv…

Shanghai Rogers Valve Co.,Ltd.

No. 888 Shantong Road, Jinshan District, Shanghai

+86-21-33758111

+86-21-33758119

rovv@rovv-valve.com

www.rovv-valve.com

Quick navigation

  • About us

  • Products

  • Workshop

  • Honor

  • Download

  • Application

  • News

  • Contact us

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video


  • Copyright © 2023 Shanghai Rogers Valve Co.,Ltd..  All rights reserved. Sitemap