CN / EN

  • Home

  • About us

    About us

    Development history

    Corporate culture

    Global layout

    Social responsibility

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video

  • Workshop

    Production workshop

    Quality reality

  • Honor

    Qualification

    Enterprise Honor

  • Download

  • Application

  • News

  • Contact us

The Daqing Oilfield has maintained a stable output of over 10 million tons for 24 consecutive years through tertiary oil recovery.

Release time:2025-12-12 11:15:41 Clicks:


As of December 3rd, Daqing Oilfield, the world's largest research and production base for tertiary oil recovery, has achieved a tertiary oil recovery output of over 10 million tons in 2025, maintaining an output of over 10 million tons for 24 consecutive years, with a cumulative output of 330 million tons, reaching a new peak in production. Tertiary oil recovery involves injecting chemical substances into oil layers to improve the performance of oil, gas, water, and rock interactions, thereby extracting more crude oil from rock pores. After several generations of hard work, Daqing Oilfield has developed its tertiary oil recovery technology from scratch, from following to leading, and has maintained a world-leading position. It has become the dominant development technology supporting the high-quality development of Daqing Oilfield. In 2025, the oilfield's development system focused on handling three major tasks, aiming to increase the recovery rate by one percentage point, adhering to the concept of "balancing effect and benefit, and integrating technology and management", and vigorously implementing precise regulation throughout the life cycle to achieve dual improvements in development effect and output.
In the development of new blocks, the oilfield promotes high-quality injection agents, adopts an integrated project team management model, emphasizes the control of key links, and orderly advances injection and production adjustment, water drive plugging, and ground construction before injection. After injection, it strictly implements the plan and improves injection quality to achieve early injection, early effect, and more oil production. For the blocks under positive injection, it deepens precise regulation, conducts monthly effect evaluations, comprehensively identifies shortcomings, and guides rectification. It focuses on the management of 25 blocks in the water cut decline and stable stages, implementing 26,000 well adjustments and potential tapping measures annually, raising the block quality rate to 90.6%. In the subsequent water drive blocks, it adheres to the "three drive" balance, with "precise potential tapping and scale maintenance" as the core, promotes the application of the development potential evaluation system, and emphasizes precise injection and production adjustment and production management, implementing 2,644 well control and reduction measures annually. In the chemical drive injection, it strengthens the integrated control of the upstream and downstream of the preparation station, injection station, and injection well, implements "three fixed" management of standards, measures, and cycles, and implements 66,000 measures such as flushing, washing, separation, and repair annually, ensuring that the quality of the injection system reaches over 99%, effectively controlling the "volume, concentration, and viscosity" throughout the process.
" Tertiary oil recovery has become the key technology supporting the high-quality and stable production of Daqing Oilfield, and it is the cornerstone for us to be a benchmark and build a century-old oilfield," said Zhao Yunfei, the Party Branch Secretary of the Development Department of Daqing Oilfield.


Previous:The first trial of the electric pump fishing-uplift technology in the Tarim Oilfield was a success.
Next:Zhejiang Oilfield has set a new domestic record for deep shale gas drilling.
Back to list

Take a look

  • On January 21st, the Wunan 3-2-13X well of the …
  • As of December 3rd, Daqing Oilfield, the worlds…
  • On November 28th, it was learned that the Daan …
  • On November 24th, the "laser rust removal …
  • On November 12th, it was learned that a well at…
  • ​As temperatures in Northeast China continue t…
  • On November 3rd, at the well maintenance site o…
  • On October 28th, it was learned from Liaohe Oil…
  • On October 22nd, at the Laoyema Joint Station o…

Product recommendation

Three piece forged steel trunnion ball valve

Three piece forged steel trunnion bal…

Cast steel ball valve

Cast steel ball valve

Stainless steel ball valve

Stainless steel ball valve

Top entry eccentric semi ball valve

Top entry eccentric semi ball valve

Side Mounted Eccentric Semi Ball Valve

Side Mounted Eccentric Semi Ball Valv…

Shanghai Rogers Valve Co.,Ltd.

No. 888 Shantong Road, Jinshan District, Shanghai

+86-21-33758111

+86-21-33758119

rovv@rovv-valve.com

www.rovv-valve.com

Quick navigation

  • About us

  • Products

  • Workshop

  • Honor

  • Download

  • Application

  • News

  • Contact us

  • Products

    Ball valve series

    Gate valve series

    Butterfly valve series

    Check valve series

    Globe valve series

    Hydraulic control valve series

    Other valve series

    Product video


  • Copyright © 2023 Shanghai Rogers Valve Co.,Ltd..  All rights reserved. Sitemap